BHEL HARIDWAR SUMMER TRAINING REPORT BLOCK 4 PDF

BHEL Haridwar block 2 heavy fabrication, training report Summer Training Project Report on EMPLOYEE MOTIVATION OF BHEL EMPLOYEES. This project report has been made as a part of the industrial training the least; I would like to thank all the staff members of B.H.E.L. Block-4, Ranipur, Haridwar. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-4 CIM (Coil & Insulation Manufacturing) & ACG (Apparatus control Gear) v. .. undertaken summer training in Bharat Heavy Electricals Limited, Haridwar.

Author: Nebar Gosho
Country: Bhutan
Language: English (Spanish)
Genre: Travel
Published (Last): 28 April 2010
Pages: 403
PDF File Size: 3.48 Mb
ePub File Size: 7.98 Mb
ISBN: 925-1-26325-120-8
Downloads: 12157
Price: Free* [*Free Regsitration Required]
Uploader: Fauzil

Click rtaining to sign up. Steam generator up to MW unit size. Footings are provided the stator foundation shields enclose the ends of heavy end frame and form mounting of generator bear and radial shaft. Power Semiconductor Devices x.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR – ppt video online download

The complete frame is subjected to hydraulic test at a pressure of 7 atm. SCOPE — The procedure covers the measurement of capacitance per phase with respect to ground of the stator winding. This would add six million units of electricity on a daily basis. Cg — capacitance with respect to ground called ground capacitance. Published by Godfrey Gordon Modified over 2 years ago.

The company has been earning profits continuously since and paying dividend since The manufacturing of bars of standard capacity such as: The rotor houses the field winding.

  LES DECOMBRES REBATE PDF

When the generator rotates at the rated speed, the PMG generates V at 50 hertz to provide power supply to automatic voltage regulator. For fascinating and monitoring bloock healthiness of bearing insulation, shaft insulation is provided Fig.

This insulation is void free and possess better mechanical properties.

Bhel Haridwar- Training report – 800 MW bar CIM block 4 (EEE)

Test procedure for high voltage on rotor winding of T G. This test is exclusively conducted to test the health lines of insulation of winding 2. HVDC transmission systems iii. The longitudinal slots are distributed over the circumference.

To determine total leakage reactance Xl. Three phase pilot exciter 4. Respect for dignity and potential of individuals. To prevent damage to the journal due to shaft current, bearings and coil piping on either side of the non-drive and bearings are insulated from the foundation frame. To reduce the stray losses and have high strength, the rings are made up of non-magnetic haridaar worked material.

The Central Foundry Forge Plant CFFP is engaged in manufacture of large size Castings and Forgings of various types of steels like alloy steels, creep resistant steel and supercritical grade steel.

To make this website work, we log user data bkock share it with processors. The company has been earning profits continuously since and paying dividends since Rotor outside the stator at standstill.

  KNAUF ANSETZGIPS PDF

The system is capable of performing following system — 1. The elementary conductors to be Roebel transposed in the slot portion. Each retaining rings with its shrink fitted.

BHEL as a part of Pt. Repair of electrical machines. Wotan CNC horizontal boring machining. Generator is to be loaded within a very short period.

Registration Forgot your password? Each slots accommodated two bars. It is also placed at 4th place in Forbes Asia’s Fabulous 50 List of The axial fans mounted on either side of rotor ensure circulation of hydrogen gas.

Modernization and rehabilitation of power stations. That is why we make coil in two parts. It supports the laminated core and winding the stator comprises an inner frame and outer frame. This gave me, a chance to have an encounter with such heavy machines like turbo generator TG MW. Remember me on this computer. We think you have liked this presentation. Electrical machine repair shop.

All AC machines rated for more than 5 MVA or with armature core longer the machine is to be provided with at least 6 resistance thermometers of their couples which shall built inside the stator suitably distributed among the circumference at the likely hottest point.